Network Load Briefing

Short, visual briefings that relate subscriber usage peaks to known events, festivals, and corridor traffic—helping operations choose quieter maintenance windows.

Notebooks and maps used for load planning

For Operations and regional network coordinators

Result Annotated peak calendars and recommended quiet windows for a named geography

Format Two-week sprint with a live briefing

Duration 10–14 business days

Location Remote or on-site in Can Tho

Pricing From VND 22,000,000 per briefing

Led by Willowcore operations analyst

Included

  • Peak-hour heat maps for agreed cells or districts
  • Event overlay (festivals, harvest, student returns)
  • One-hour live briefing with operations staff
  • One-page summary for shift supervisors

Outside this scope

  • Radio engineering redesign
  • Vendor equipment procurement advice

How the work unfolds

  1. Confirm geography and peak definitions
  2. Build calendars and overlays
  3. Brief and revise quiet-window recommendations

Preparation

Cell or district list and known event calendar for the period

Constraints

Briefings cover one geography band unless scoped otherwise